Free flat-rate price calculator for HVAC and plumbing jobs
Free from Relay, no signup. Defaults and sources checked November 9, 2026.
A flat-rate price is your cost for the job divided by one minus the margin you want. Your cost is the labor hours times your labor cost and overhead per billable hour, plus parts. Put in your own numbers; the defaults are examples.
Time on site, plus drive time if you don't charge it separately.
Wage plus payroll taxes and benefits, divided by the share of paid hours you bill. Work out yours.
Yearly overhead, including trucks if your labor cost leaves them out, divided by the hours your technicians bill.
Profit as a share of the price, after labor, overhead and materials.
Flat-rate price
$230
$46 profit, a 25% markup on cost. Works out to $153 per labor hour.
| Labor | $99 |
|---|---|
| Overhead | $60 |
| Parts and materials | $25 |
| Total cost | $184 |
| Price at a 10% margin | $204 |
|---|---|
| Price at a 20% margin | $230 |
| Price at a 30% margin | $263 |
| Price at a 40% margin | $307 |
| Price at a 50% margin | $368 |
Prices before tax. Rounded to whole dollars; 1.5 labor hours.
How the price is calculated
- Labor: hours for the job × labor cost per billable hour.
- Overhead: hours for the job × overhead per billable hour.
- Cost: labor + overhead + parts and materials.
- Price: cost ÷ (1 − target margin).
Because overhead is already in the cost, the margin here is your net profit on the job. The price per labor hour is a useful check: it's the hourly rate the flat price works out to, so you can compare it with what customers in your area pay for time and materials.
Where the defaults come from
The $66 labor cost is the BLS median wage for HVAC mechanics and installers, $29.33 an hour in May 2025, multiplied by 1.46 and divided by 0.65. The 1.46 is the ratio of total compensation to wages for installation, maintenance and repair jobs in the BLS employer costs survey (June 2026), and it covers payroll taxes, insurance, paid leave and retirement. Dividing by 0.65, an example share of paid hours billed to customers, spreads the cost of the hours you don't bill over the ones you do. Plumbers' median wage is $30.67.
The $40 of overhead (trucks included), 1.5 hours and $25 of parts are examples. Work out your own labor cost and overhead with the labor rate calculator.
Turning prices into a pricebook
Price your most common repairs first. Round to prices you're comfortable saying out loud, and review them when wages, parts costs or overhead change. Replacements and large jobs are better quoted as options than as one flat price. Our guides on HVAC flat-rate pricing and plumbing pricebooks cover how to set one up.
Flat rate in Relay
In Relay's pricebook, a service's price can be entered by hand or calculated from its labor and materials, and each service shows its expected cost and margin. Relay comes with starter HVAC and plumbing services, with labor and materials already filled in, for you to review and price. Price changes apply to new estimates and invoices; documents you've already sent keep their prices. Relay is $99 a month for 1–2 technicians or $199 for 3–9.
Questions
What margin should a flat-rate price have?
There's no standard figure. This calculator puts overhead in the cost, so the margin is your net profit on the job. Start from the profit you need for the year divided by the revenue you expect, then check the price per labor hour against what customers in your market accept.
Should drive time be in the labor hours?
If you don't charge a separate trip or service call fee, yes. If you do, leave drive time out of the flat-rate price so the customer doesn't pay for it twice.
What's the difference between margin and markup?
Margin is profit as a share of the price; markup is profit as a share of cost. A 20% margin is a 25% markup, and a 50% margin is a 100% markup.