Free job materials and purchase-list planner
Free from Relay, no signup. Sources checked November 14, 2026.
Turn job requirements into a materials list, check the same parts in your saved truck inventory, and prepare a supplier-ready purchase list. Keep several jobs on this browser and combine them into one purchase run. Nothing is ordered or moved automatically.
Plan materials for your jobs
Opening saved jobs…
Opening truck counts…
Open truck inventoryAdd the parts this job needs, or start from an editable service example.
Selected jobs share one truck count. Incoming stock reduces additional buying, but stays unavailable until received.
Materials planning list
Internal planning only. No order placed and no stock changed.
Select a job with materials to prepare a purchase list.
Planning does not reserve, consume or move stock. Your truck counts stay unchanged. Plan ongoing replenishment.
From job requirements to a purchase list
- Name the job and add its exact materials and quantities. Link each carried material to the existing truck inventory part. Similar names are not interchangeable specifications.
- Select the jobs to include. Demand for the same linked part is added together before the truck count is used, so two jobs cannot each claim the full count.
- Enter stock already committed to other, unselected work; incoming quantities for this truck; supplier reference; and units per pack. Check delivery dates before relying on incoming material.
- Review immediate shortages and additional buying separately. Export the supplier-ready CSV or a planning PDF. Confirm specifications and supplier availability before placing an order.
How shortages and packs are calculated
Available now = max(0, on hand − other-work commitments). Needed before work = max(0, selected-job demand + other-work commitments − on hand). Additional units to buy = max(0, needed before work − incoming). Packs to buy = additional units ÷ units per pack, rounded up to a whole pack.
For two jobs needing 3 and 4 identical parts, with 5 on hand, 1 committed elsewhere and 1 incoming, 4 are available now, 3 are needed before work, and 2 additional units need buying. If the supplier sells packs of 6, buy one pack: 6 units. The incoming unit has not made the jobs ready now.
If existing commitments exceed on-hand stock, the additional shortfall is included and named. Do not enter the selected jobs again as other-work commitments.
Service materials are editable examples
The HVAC and plumbing service examples reuse Relay’s public starter catalog, version 2026.6. Quantities are starting assumptions for a defined residential scope, not trade standards, a complete installation takeoff, or a compatibility decision. Replace every generic specification with the part your equipment and job require.
Only an existing starter identity can link automatically. Unmatched example materials remain unlinked until you select a truck part or explicitly confirm they are not carried. Three additional original examples cover two matching surveyed electrical cover plates, a surveyed door’s bottom weatherseal, and a confirmed pair of washer inlet hoses: one hot and one cold. Known counts follow only that named scope; the weatherseal length stays blank until measured. These examples always need an explicit stock review, including exact part specifications and supplier units.
Keep your work without an account
Job plans save locally in this browser. The planner reads the same device-stored parts list as the truck app; it does not maintain a second set of stock counts. Refresh counts after updating the truck list in another tab. Download separate backups of your job plans and truck inventory before changing browsers or clearing storage.
Restoring a plan replaces its job requirements and purchasing assumptions after confirmation. It never replaces truck stock. If a saved part no longer exists or its unit changed, review its link before exporting purchase quantities. Storage failure leaves current edits available for a backup.
Planning is separate from stock movement
The tool does not reserve, consume, transfer or receive parts, place a purchase order, contact suppliers, synchronize a team workspace, or check technical compatibility. Counts stay unchanged. Update actual counts in the truck app only when you have checked physical stock.
This separation follows the practical distinction described in Ply’s field-request guidance: a request and an actual material movement are different operations. Its kit guidance also illustrates grouping component materials for recurring work. Relay’s planner is an original local worksheet, with no Ply integration or shared-stock claim.
For ongoing usage, lead time and safety-stock planning, continue to the reorder-point calculator. For a customer price and approved scope, use the estimate builder.
Questions
Does a materials plan change truck stock?
No. It reads the existing list on this browser and calculates a purchasing scenario. It does not reserve, consume, transfer or receive material, or place an order.
Do incoming parts count as available now?
No. Incoming parts may reduce additional buying, but the needed-before-work quantity remains based on physical on-hand stock and separately committed quantities. Review delivery timing before starting the job.
Can several jobs use the same stock count?
Select them in the same purchase run. Their demand is combined by the exact linked truck part before comparing it with stock. Enter commitments for unselected work separately, without counting selected jobs twice.
What happens if counts or part links are missing?
Purchase quantities stay unresolved and the purchase export is unavailable. You can still keep the requirements and download a backup or materials CSV. Correct the truck count, relink the part, or explicitly confirm the material is not carried.